
Queen Victoria Apartments – Grundfos 3-Phase Pump Replacement
14 Aug 2026
Same-day response to a flooded Rose Park car park, then a custom Grundfos Super Vortex 415V stormwater pump installed in a shipping-container-sized pit.
Read case studyReal jobs from Adelaide's trusted plumbing and pump specialists.

14 Aug 2026
Same-day response to a flooded Rose Park car park, then a custom Grundfos Super Vortex 415V stormwater pump installed in a shipping-container-sized pit.
Read case study
4 Aug 2026
A CBD basement sewer station on Pirie Street went into alarm and started flooding. Mayfair replaced failed dual pumps with Zenox grinders and set up quarterly inspections.
Read case study
29 July 2026
Programmed maintenance found a North Adelaide basement sewer pump about 95% failed. Same-day cutter pump replacement prevented a sewage emergency.
Read case study